| Code | Date | City | Fees | Register |
|---|---|---|---|---|
| T009 | May 18, 2025 - May 29, 2025 | Basel | $ 6000 |
Register Course.. |
| T009 | August 3, 2025 - August 7, 2025 | Al-Doha | $ 5200 |
Register Course.. |
| T009 | November 23, 2025 - November 27, 2025 | Berlin | $ 6000 |
Register Course.. |
| T009 | February 1, 2026 - February 5, 2026 | Istanbul | $ 6000 |
Register Course.. |
________________________________________________________________________________________________
Objectives
The participant will be able to evaluate the current production system of a well for efficiency, recognize and correct problems with equipment and operating procedures and design the most effective system for a producing well. electrical submersible pumps and sucker rod pumps lift System applications, design, installation, optimization & troubleshooting.
The Delegates
Engineers and field technicians who are responsible for the selection, operation and maintenance of ESP systems.
Contents
- Introduction
- Artificial lift
- Well and Reservoir Inflow Performance
- Vertical Flow Performance
- Outflow Performance & Multiphase Flow
- Outflow Performance Prediction
- Deliverability vs Injection-Depth
- Water cut Effect
- Wellhead Pressure
- Artificial Lift Methods
- Electrical submersible pumps principle
- Operation principle and performance
- Surface and Subsurface Equipments
- Advantage & Limitations
- Continuous Flow Unloading Sequence
- Sucker rod pumps
- Operation and characteristics of sucker rod
- Equipments
- Mandrel
- Running tools
- Pulling tools
- Design and Installation
- Operation and Optimization
- Monitor lift performance
- Conduct well test and optimize artificial lifting on production wells.
- Well software model for production wells using Prosper.
- Evaluate gas lift problems and remediation.
- Perform design for gas lift valve arrangement on newly drilled wells.
- Well performance
- Troubleshooting
The Discount
10% in case of Three P. (or more)
Course File
Download Now!