Code | Date | City | Fees | Register |
---|---|---|---|---|
T012 | April 14, 2024 - April 16, 2024 | Online | $ 1200 |
Register Course.. |
T012 | July 1, 2024 - July 5, 2024 | Dubai – UAE | $ 5000 |
Register Course.. |
T012 | October 13, 2024 - October 17, 2024 | Kulalumber | $ 5000 |
Register Course.. |
T012 | January 1, 2025 - January 3, 2025 | London | $ 3000 |
Register Course.. |
________________________________________________________________________________________________
Objectives
- By the end of this Course participants will be able to:
- Manage and execute Coiled Tubing interventions
- Increase overall operational performance during Coiled Tubing interventions
- Select the most commonly used downhole tools and explain their function
- Work safely with liquid nitrogen
The Delegates
- This training course is designed for those involved in the production optimization and well intervention operations:
- Production Technologists
- Production Engineers
- Operations Engineers
- Field Technicians
- Reservoir Engineers
Contents
- Day One: Coiled Tubing Equipment
- Coiled Tubing Services
- Coiled Tubing Equipment
- Surface CT Equipment
- Downhole Equipment
- Day Two: Well Control Equipment
- Barrier theory
- Primary, secondary and tertiary barriers
- BOP types
- Strippers
- Riser and flange connections
- Day Three: Coiled Tubing Application
- CT String and Pipe Management
- Data Acquisition
- Depth Control
- CT Applications
- Matrix Stimulation with CT
- CT Logging
- Nitrogen
- Day Four: Job Design
- Introduction to Job Design
- Safety and Operational Standards
- Job Design – Risk Analysis
- Downhole Tools
- Day Five: Acidizing and Stimulation Techniques
- Damage mechanisms
- Chemistry of carbonate acidizing
- Acid treatment design in carbonate
- Fluid selection for carbonate acidizing
- Chemistry of sandstone acidizing
- Acid treatment design in sandstone
- Fluids selection for sandstone acidizing
- Additives used in acidizing and their functions
- Introduction to hydraulic fracture
- Reasons for hydraulic fracture
- Hydraulic fracture material s and process
- Case studies
The Discount
10% in case of Three P. (or more)