Objectives

  • On successful completion of this course, delegates will:
  • Understand the basis for the use of a UPS .
  • Understand Critical Load Applications .
  • Have an appreciation of Power Problems .
  • Be able to review the installation and maintenance requirements of a UPS and Stand-by power installation .
  • Be able to improve reliability by improving the resilience of an electrical installation

The Delegates

This course is directed at electrical technicians, maintenance professionals and electrical engineers who would like to expand their knowledge of UPS systems.

Contents

  • Introduction to the Resilient System :
  • Introduction
  • Regulations
  • Critical loads
  • Purpose of an Installation
  • Compatibility
  • Protection and Devices
  • UPS or Generator
  • Maintenance
  • What is a UPS?
  • UPS Rating
  • Parallel systems
  • What is available
  • Maintenance by-pass
  • Off Line systems
  • Redundancy
  • On Line systems
  • Interactive systems
  • UPS Components :
  • Transformer methods
  • Harmonics
  • Invertors
  • Twelve pulse rectifier
  • Phase control
  • Power factor
  • Six pulse rectifier
  • Static switch
  • Batteries :
  • What is a battery?
  • Storage and Care
  • VLRA
  • Choosing a battery size
  • Size and location
  • Charging
  • Configuration
  • Battery safety
  • Generators and Site Planning :
  • Do I need a Generator?
  • Environmental Constraints
  • Mains failure
  • Monitoring power
  • UPS Compatibility
  • Installing the UPS
  • Generator size considerations
  • Maintaining the UPS